University of Toronto, Scarborough – Design Build Chiller Boiler Plant

Project Description

VR Mechanical was hired by The University of Toronto to build a glycol chilled water and glycol heating boiler plant. The two existing Process chillers (65 Ton each) were decommissioned and a new plant was designed. The revised load went from 130 tons of cooling to 220 Tons. This plant is one of the most sophisticated plants ever built.