University of Toronto, Scarborough – Alfonse Clean Room

Project Description

VR Mechanical was hired as the design build prime contractor for the Alfonse Clean Room. We hired all the consultants and coordinated all drawings, meetings, and sub-trades. Access was very restricted for materials. Air handler modules were restricted to specific sizes to reach final destination. All air filtration, air flow, water purification were critical to meet the design criteria. Classification was ISO 6/ Class 10,000. 99.7 HEPA filtration and 67 air changes per hour. This clean room was built of high quality aluminum extrusions and panels. All case work and fume hoods were high quality stainless steel.