Commercial

Upper Canada Mall

Upper Canada Mall is an Oxford property and aiming to become one of the largest most prestigious shopping centres in the area. Anchored by Hudson's Bay, Old Navy and Gap, the mall's redevelopment plan includes additions such as: a two-level feature court space, a best in class food court, Sport Chek and a 3,251 m2 (35,000 ft2) vertical expansion. The currently 2,453 m2 (26,400 ft2) Sport Chek will...

View Project

80 Atlantic Avenue – New Building Development

VR Mechanical
  • Project Type:
    Commercial
  • Constructor:
    Eastern Construction Company Ltd.
  • Location:
    80 Atlantic Avenue, Toronto
  • Date Completed:
    Current

View Project

Presentation Manor for Seniors

VR Mechanical
Presentation Manor is a seniors residence with 229 suites, including 51 units for Assisted Living and 178 units for Independent Living.

View Project

Waterpark Place III RBC Tenant Fit-out

Tenant build-up for new National Headquarters for RBC Canadian Banking Toronto consisting of 22 floors of office space and new Auditorium of approximately 600,000 square feet. The mechanical work consisted of; heating / chilled / domestic water / drainage piping, sheet metal (ductwork), insulation, BAS controls and balancing all on Leeds Gold status. The Project was completed on time and in budge...

View Project

Massey Hall Revitalization

Renovation to this National Historic site included new air distribution system, plumbing, chilled water piping, controls and insulation.

View Project

Hotel X

The Hotel X project involves the construction of a new approximately 753,500 square foot cutting edge hotel complex at 111 Princes’ Boulevard on the Exhibition Place grounds in Toronto. Two lower levels below grade provide parking, kitchens, laundry and staff back-of-house areas. Four levels of podium provide the grand two storey entrance Lobby, with a Living green wall behind the Front Desk, th...

View Project

MaRS Phase II – PHO Fit-out

The project consisted of a fit-out of the top four floors of rentable space in the MaRS Phase-2 tower in downtown Toronto. The facility allows the tenant – Public Health Ontario, to accommodate modern testing platforms, and to improve capabilities for molecular diagnostic testing and research. It includes a CL3 laboratory, flexible CL2 laboratories and related office, administrative and support ...

View Project

Branksome Hall Athletic & Wellness Centre

New facility of Athletics and Wellness to supplement the School of Branksome Hall. The mechanical work consisted of; drainage / domestic water / gas / heating / chilled water piping, sheet-metal (ductwork), insulation, BAS (controls) and balancing.

View Project

Delta Hotel Toronto

Design assist 45 storey hotel, complete with three levels of parking.              

View Project

Bridgepoint Health Centre, Toronto Don Jail – Infrastructure Ontario

  • Description:
    Conversion to Hospital Administration Building - Design Build
  • Constructor:
    PCL
  • Mechanical Consultant:
    Smith & Andersen
  • Location:
    14 St. Matthews Road Toronto Ontario
  • Date Completed:
    July 2013

View Project