Completed Projects

Waterpark Place III RBC Tenant Fit-out

Tenant build-up for new National Headquarters for RBC Canadian Banking Toronto consisting of 22 floors of office space and new Auditorium of approximately 600,000 square feet. The mechanical work consisted of; heating / chilled / domestic water / drainage piping, sheet metal (ductwork), insulation, BAS controls and balancing all on Leeds Gold status. The Project was completed on time and in budge...

View Project

McMaster Children’s Health Centre

Design, construction and financing of a new state of the art children’s treatment centre in Hamilton, Ontario. The facility will incorporate a number of existing programs under one roof that include, autism spectrum disorder services, child mental health services, development pediatrics and rehabilitation, and prosthetics and orthotics. MCHC is part of Hamilton Health Sciences and McMaster Child...

View Project

University of Toronto, Scarborough – Science & Chemistry Building

Design and construction of a new state of the art academic laboratory facility. The facility incorporates innovative design solutions for sustainable and highly flexible research and teaching space, connecting laboratories and academic offices around a sky-lit forum and crossroads. The facility is designed to LEED Gold standard and sustainable features include geothermal boreholes, and an earth tu...

View Project

Massey Hall Revitalization

Renovation to this National Historic site included new air distribution system, plumbing, chilled water piping, controls and insulation.

View Project

MaRS Phase II – PHO Fit-out

The project consisted of a fit-out of the top four floors of rentable space in the MaRS Phase-2 tower in downtown Toronto. The facility allows the tenant – Public Health Ontario, to accommodate modern testing platforms, and to improve capabilities for molecular diagnostic testing and research. It includes a CL3 laboratory, flexible CL2 laboratories and related office, administrative and support ...

View Project

Branksome Hall Athletic & Wellness Centre

New facility of Athletics and Wellness to supplement the School of Branksome Hall. The mechanical work consisted of; drainage / domestic water / gas / heating / chilled water piping, sheet-metal (ductwork), insulation, BAS (controls) and balancing.

View Project

Delta Hotel Toronto

Design assist 45 storey hotel, complete with three levels of parking.              

View Project

Bridgepoint Health Centre, Toronto Don Jail – Infrastructure Ontario

  • Description:
    Conversion to Hospital Administration Building - Design Build
  • Constructor:
    PCL
  • Mechanical Consultant:
    Smith & Andersen
  • Location:
    14 St. Matthews Road Toronto Ontario
  • Date Completed:
    July 2013

View Project

Metrolinx GO Oakville Parking Garage

Design build six story parking structure. Over 1,200 parking spaces available and parking structure is linked to the train platforms.

View Project

University of Toronto, Scarborough – Design Build Chiller Boiler Plant

VR Mechanical was hired by The University of Toronto to build a glycol chilled water and glycol heating boiler plant. The two existing Process chillers (65 Ton each) were decommissioned and a new plant was designed. The revised load went from 130 tons of cooling to 220 Tons. This plant is one of the most sophisticated plants ever built.

View Project